Case Study
Effluent Water Treatment Plant

Duratuf supplies IEC 61111:2009 Class 1 insulating mats for EPIC for constructing a new wastewater treatment facility at the Natural Gas Liquid (NGL) complex in Mesaieed, Qatar.

Electrosteel Castings Ltd., India

Duratuf supplied Shot Blasting Rubber Sheet (SHB13560S-BLA), designed for heavy abrasion and impact protection.

Qatar Metro Rail

Duratuf has supplied IEC 61111 Class 1 safety mats to Integrated Metro Rail Project, Qatar in 2019.

Qatar Gas, NFPS Phase II

Duratuf Insulating Mats were supplied to Qatar Gas, NFPS Phase II project, Qatar peninsula in 2022-23.

Marjan Oil Field Developement

Duratuf ASTM D178 was supplied to Marjan Oil Field Development, East coast of Saudi Arabia in 2022-23.

Kuwait Small Boat Harbor

Duratuf ASTM Insulating Matting is supplied to Small Boat Harbor Project, Kuwait in 2015.

Kuwait Oil Company

Duratuf IEC 61111 Insulating Mats were approved & supplied to Kuwait Oil Company, Kuwait in 2018.

Buzios Oil Field- P-79 FPSO

Duratuf Insulating Mats were supplied to Petrobras – Buzios Oil Field – P-79 FPSO Project, Brazil in 2022.

Abu Dhabi Int’l Airport

Duratuf has supplied ASTM D178 Insulating Mats for the Midfield Airport Terminal Project in 2015.

Hear from Our Customers
Customers Experience Video

Watch how Duratuf products are helping industries perform with confidence

Customers Feedback

Proof of performance, straight from the people who use it. Here’s what our customers say about Duratuf.

Chosen by Industry Leaders and Top Professionals
Finished scrolling? Take action NOW to get RESULTS 😊
Translate